[Examples of Problem Solving within the Design Department] Collaboration Function from PDM
Importing PDM information and flowing in the data! About seamless integration from PDM.
"Due to the lack of a system to link E-BOM information managed in CAD, PDM, etc., with the production management system, information is not accurately conveyed." Here, we will introduce an example of solving issues within the design department. Assuming that drawings are issued sporadically from the design, it is possible to incorporate configuration information as needed, thereby reducing input load and eliminating input errors. Additionally, depending on the higher-level system, it can also accommodate additions, changes, and deletions of configuration information due to design changes. By linking the data necessary for production number configuration from CAD and PDM drawing information, we can reduce double entry and input errors in the production number parts list. Furthermore, if there are functions on the CAD/PDM side, it is also possible to return cost information, thereby instilling cost awareness in the design. [Overview] ■ Issues - There is no system to link E-BOM information managed in CAD, PDM, etc., with the production management system, resulting in inaccurate information transmission. ■ Solution - By importing PDM information and flowing information in, we achieve error-free data linkage. *For more details, please refer to the PDF document or feel free to contact us.
- Company:NTTデータ関西 法人分野
- Price:Other